0
0
Loading version...
🔄 Update App
🔍 Check for Updates
Test Notification
🔔 Enable Notifications
📰 Fetch NHK News
🚀 Fetch TechCrunch News
🧪 Experiment
📰 Article Management
📚 Reading List
🎤 Speaking List
📊 Statistics
💻 Software Statistics
Push Admin
Edit Reading
Back to List
Basic Information
Title
Please enter a title.
URL
Please enter a valid URL.
Date
カテゴリID
画像ファイル名
統計情報
単語数:
193語
読了回数:
0回
作成日:
2022/02/10 07:10
更新日:
2025/12/09 17:56
本文
本文
The operator of the damaged Fukushima Daiichi nuclear plant has released images of deposits under the water inside the facility's No.1 reactor. Tokyo Electric Power Company, or TEPCO, began a robot probe inside the reactor's containment vessel on Tuesday. On Wednesday, the utility explained that the first robot had finished securing a passageway in the water for other robots. TEPCO also released video taken by the robot's camera. It shows the robot installing a ring, which will keep cables of robots from getting stuck within structures inside the containment vessel. The video also shows matter accumulated around the entrance of a pipe at the bottom of the containment vessel. TEPCO says it cannot determine at this stage whether the matter is molten fuel debris. The utility plans to retract the first robot on Thursday and put the second one in to take more precise images as soon as preparations are finished. The Fukushima Daiichi plant suffered a triple meltdown in the March 2011 earthquake and tsunami. Previous surveys confirmed the presence of deposits believed to be fuel debris in the No. 2 and No. 3 reactors, but not in the No. 1 reactor.
本文を入力してください。
メモ
メモ・感想
キャンセル
更新
Debug Info:
Saved State:
-
Redirected Flag:
-
Current URL:
-
Refresh
Close
Debug
Send Report
Send Report
Draw Arrow
Clear
Message:
Cancel
Send