0
0
Loading version...
🔄 Update App
🔍 Check for Updates
Test Notification
🔔 Enable Notifications
📰 Fetch NHK News
🚀 Fetch TechCrunch News
🧪 Experiment
📰 Wordlist List
📚 Reading List
🎤 Speaking List
📊 Statistics
💻 Software Statistics
Push Admin
Edit Reading
Back to List
Basic Information
Title
Please enter a title.
URL
Please enter a valid URL.
Date
カテゴリID
画像ファイル名
単語数(空欄の場合は本文から自動計算)
空欄の場合は本文から自動計算されます。本文が空欄の場合は既存の値が保持されます。
統計情報
現在の単語数:
160語
読了回数:
0回
作成日:
2025/11/12 22:42
更新日:
2025/12/07 22:17
本文
本文
1. Data center power demands have increased significantly, with projections reaching up to multi-megawatt racks in the next few years. - Tim Heidel, CEO of Veir, predicts future data centers will require up to a megawatt and even higher. 2. To address the challenges of handling this growing power load, Veir has developed a superconducting electrical cable system capable of carrying 3 megawatts of low-voltage electricity. - The startup aims to demonstrate the technology in a simulated data center next year before a commercial launch in 2027. 3. Superconductors can carry power with zero energy loss, but they need to be cooled below freezing temperatures. Veir has adapted this technology for use in data centers by containing the liquid nitrogen coolant within the cables and using termination boxes to transition from superconductors to copper cables. - This results in cables that require 20 times less space while carrying power five times farther, making them ideal for dense data center environments.
メモ
メモ・感想
2025-11-12
キャンセル
更新
Debug Info:
Saved State:
-
Redirected Flag:
-
Current URL:
-
Refresh
Close
Debug
Send Report
Send Report
Draw Arrow
Clear
Message:
Cancel
Send